County of Nelson issued the following announcement on Sept. 7
Highway work requiring road/lane/structure closures planned; however, work may be delayed/canceled due to weather or other issues. Items in italics contain new/updated information. For up-to-date information, call 511 or visit www.511Virginia.org.
District-wide activities:
Crews will perform various activities throughout the district to include, but are not limited to bridge/guardrail maintenance, pavement marking, brush/tree/limb cutting, pothole/surface/shoulder work, work orders, mowing, boom axing, drainage repairs/work and roadside cleanup.
Work at specific locations:
Amherst County:
Route 29 Bus (Lakeside Dr-Woodys Lake Rd) – Sidewalk work. Lane closures/delays. Est comp. 11/21.
Route 681 – Bridge rehab through September 24, 2021. One 10’6” lane controlled by signal.
Please note districtwide activities above.
Appomattox County:
Route 460 (707—Prince Edward line) – Widen shoulders, install rumble strips. Est. comp. – Nov 2021.
Please note districtwide activities above.
Buckingham County:
Route 60 @ Route 15 – Crew will work signal.
Route 636/15 – Turn lane project. Fixed completion October 15, 2021.
Please note districtwide activities above.
Campbell County:
Route 29 N over NSRR, near airport – 1 lane bet. Routes 678 & 460 on Sept. 11 & 12 day/night& nights Sept. 13-16. Bridge and approach work; est. comp. May 2023.
Route 29 S (683- Co. line), 29 N (. Co. line- 699) – Pruning/sm. tree removal. Est. comp 9/25. Closures.
Route 29 N (906-912), 460 W(793-Concord Tpke), & 501 (605-1116)– Milling /paving.
Route 460 @ Route 24 – Crew will perform signal maintenance.
Routes 29 Bus, Town of Altavista & 501 (24 – 40) – Crew will paint long lines.
Please note districtwide activities above.
Charlotte County:
Route 616, Phenix AHQ – Crew will work Rural Rustic project.
Route 618 over Turnip Creek – Weight limit reduced from 13 to 7 tons.
Please note districtwide activities above.
Cumberland County:
Please note districtwide activities above.
Halifax County:
Route 58 E over Perrin Creek – One lane closed thru Oct. 29 for repairs.
Route 360 and other routes – Litter pick up may result in delays. Be alert to presence of crew.
Routes 501 & 610 – Passing lane project. Use caution during changing road conditions & traffic pattern. 35 mph at all times during construction. Route 610 connections to 501 closed; one-way detour via Route 610/643 estimated to begin Sept. Fixed completion- May 5, 2023.
Route 626 – Alignment improvements. Estimated completion – October 8, 2021.
Please note districtwide activities above.
Lynchburg:
Route 29/460 (Campbell Ave–Concord Turnpike) – Bridge replacement. Northbound 29/eastbound 460 speed limit 45 mph. Lane closures changes in traffic pattern likely. Completion July 31, 2023.
Nelson County:
Route 6– Bridge project. 11′ width restriction on Route 6 W at bridge. Signs, message boards will assist. Estimated completion-October 2021.
Route 653, Wilson Road (650-655) – Closed 8 a.m.-5p.m. daily, 9/13-9/24, for geotechnical work. Detour via 653, 650, 56, 647, 722, 655 and back to 653.
Please note districtwide activities above.
Pittsylvania County:
Route 29 N&S bet. Blairs and Tightsqueeze – Anticipate changes in traffic pattern, heavier traffic during upcoming events. The left/passing lane will be open for thru traffic.
Route 58 and other routes – Litter pick up may result in delays. Be alert to presence of crew.
Route 669, Melon Road – Closed for pipe replacement. Detour via 669, 603, 668, 640 & 669.
Route 686 (640-1084) – Closed until 11/5 for bridge replacement. Detour via 640, 682 to 686.
Route 730 (729-1254) – Closed to thru traffic 10/4-11/12 for culvert replacement. Detour: 730, 729, 732, 726, 733 and 730.
Route 786, Snowberry Rd (785-799) – Closed 9/13-10/22/21 for culvert replacement. Detour via Route 786, 785, 605, 799 back to 786.
Route 794, Gretna AHQ – Closed 8 am- 5 pm each day, 8/19-9/15 for shoulder widening. Detour via 794, 790, 797, 649 to 794.
Route 1324, Gretna AHQ – Crew will replace mainline pipe.
Please note districtwide activities above.
Prince Edward County:
Route 15/692 roundabout – Construction. Fixed comp. Nov. 11, 2022.
Route 751 – Crew will work on Rural Rustic project.
Please note districtwide activities above.
Original source can be found here.